Gas Treatment Equipment

Gas treatment equipment ready for delivery. The project scope included engineering, fabrication and delivery of a gas pre-filter scrubbers, dust-liquid separators, heat exchangers and hot water boiler unit for a power plant located in Libya.

Piping, valves and instrumentation will be delivered loose for integration at site. The equipment and materials will be packed and fastened in containers for sea-transport.